[1]
Wati, I. and Z, N. 2018. Analisis Penerapan Manajemen Waktu Pada Proyek Jalan Kabupaten Polewali Mandar. BANDAR: JOURNAL OF CIVIL ENGINEERING. 1, 1 (Oct. 2018), 14–24. DOI:https://doi.org/10.31605/bjce.v1i1.156.