Sutriani, M.Rizal, & Zamad, N. (2025). A Scheduling Management for Tomata Road Using CPM and PERT Method. Jurnal Teknik Sipil , 1(1), 20–31. https://doi.org/10.31605/jutsi.v1i1.5067