All documents in the published articles are accepted manuscripts for publication in the Bandar Journal of Civil Engineering is a civil engineering. This edition is available online for the regular edition Vol. 7 No. 2 (2025): November.

ON PROCESS

DOI: https://doi.org/10.31605/bjce.v7i2

Published: Nov 18, 2025

Analysis of Sediment Characteristics and Sedimentation Rate of the Noling River, Luwu Regency

81-88 Juliandro Juliandro, Muhammad Syafa'at S Kuba, Farida Gaffar, Ismail Pawara
Read Statistic: 22

Analysis of Road Damage and Its Improvement on The South Ring Road of Jambi City

89-101 Tendy Laksana Laksana, Melawaty Agustien, Edi Kadarsa
Read Statistic: 16

Study of Jetty Planning as Coastal Protection Structure to Address Estuary Sedimentation: Case Study of Lubuk Tukko Beach, North Sumatra Province

102-110 M Gilang Indra Mardika, Indri Rahmandhani Fitriana, Tera Melya Patrice Sihombing, Oscar Lumbantobing
Read Statistic: 37

The Distribution Pattern of Coffee Shop Public Spaces Based on Geographic Information System (GIS) in Majene Urban Area

111-116 Astinawaty Astinawaty, Jafar Mukhlis, Ahmadussaleh Ahmadussaleh, Muhammad Fauzan Ahmad
Read Statistic: 16

Analysis of Factors Affecting Driving Safety at PT. Cakraindo Mitra International

117-124 Irpan Numang
Read Statistic: 21

Numerical Investigation of Soft Ground Improvement beneath Road Embankments Using Prefabricated Vertical Drains: Insights from PLAXIS 2D Modeling

125-136 Muh Miftahulkhair, Irma Ridhayani, Nur Okviyani, Herni Suryani, Ellyyni Dwi Fortuna
Read Statistic: 11

Insurgent Planning Practices in Indonesia’s Development Planning

137-142 Nanda Mutiara Zani, Azizah Putri Abdi, Jafar Mukhlis
Read Statistic: 17

Clean Water Infrastructure Provision Strategy to Support the Industrial Sector in Indramayu Regency in Supporting the Rebana Area

143-152 Nur Zahrah Afifah, Azizah Putri Abdi, Fadiah Izzah Ajrina
Read Statistic: 18

The Effect of the Number of Work Shifts for Erection Box Girder Using Launching Gantry on the Cost and Implementation Time in the Medan-Binjai II Railway Line Project

153-161 Ely Mulyati, Dessy Amelia
Read Statistic: 13